1724b95b92
The code in reweight_entity() can be simplified. For a sched entity on the rq, the entity accounting can be replaced by cfs_rq instantaneous load updates currently called from within the entity accounting. Even though an entity on the rq can't represent a task in reweight_entity() (a task is always dequeued before calling this function) and so the numa task accounting and the rq->cfs_tasks list management of the entity accounting are never called, the redundant cfs_rq->nr_running decrement/increment will be avoided. Signed-off-by: Jiang Biao <benbjiang@tencent.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Reviewed-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Reviewed-by: Vincent Guittot <vincent.guittot@linaro.org> Link: https://lkml.kernel.org/r/20200811113209.34057-1-benbjiang@tencent.com |
||
---|---|---|
.. | ||
autogroup.c | ||
autogroup.h | ||
clock.c | ||
completion.c | ||
core.c | ||
cpuacct.c | ||
cpudeadline.c | ||
cpudeadline.h | ||
cpufreq_schedutil.c | ||
cpufreq.c | ||
cpupri.c | ||
cpupri.h | ||
cputime.c | ||
deadline.c | ||
debug.c | ||
fair.c | ||
features.h | ||
idle.c | ||
isolation.c | ||
loadavg.c | ||
Makefile | ||
membarrier.c | ||
pelt.c | ||
pelt.h | ||
psi.c | ||
rt.c | ||
sched-pelt.h | ||
sched.h | ||
smp.h | ||
stats.c | ||
stats.h | ||
stop_task.c | ||
swait.c | ||
topology.c | ||
wait_bit.c | ||
wait.c |