forked from Minki/linux
11e451e740
Fences attached to deferred client work items now originate from channels belonging to the client, meaning we can be certain they've been signalled before we destroy a client. This closes a race that could happen if the dma_fence_wait_timeout() call didn't succeed. When the fence was later signalled, a use-after-free was possible. Signed-off-by: Ben Skeggs <bskeggs@redhat.com> |
||
---|---|---|
.. | ||
drm | ||
host1x | ||
ipu-v3 | ||
vga | ||
Makefile |