In the past the we always tried to allocate an fmr_pool
and if it failed on ENOSYS (not supported) then we continued
with dma mr. This is not the case anymore and if we tried to
allocate an fmr_pool then it is supported and we expect to succeed.
Also, the check if fmr_pool is allocated when free is called is
redundant as well as we are guaranteed it exists.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Avoid struct names without iser_ prefix.
This patch does not change any functionality.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Have fast_reg_descriptor hold struct iser_reg_resources
(mr, frpl, valid flag). This will be useful when the
actual buffer registration routines will be passed with
the needed registration resources (i.e. iser_reg_resources)
without being aware of their nature (i.e. data or protection).
In order to achieve this, we remove reg_indicators flags container
and place specific flags (mr_valid) within iser_reg_resources struct.
We also place the sig_mr_valid and sig_protcted flags in iser_pi_context.
This patch also modifies iser_fast_reg_mr to receive the
reg_resources instead of the fast_reg_descriptor and a data/protection
indicator.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Adir Lev <adirl@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Use ib_alloc_mr with specific parameters.
Change the existing callers.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
This was added in a thought of uniting all mr allocation
and deallocation routines but the fact is we have a single
deallocation routine already, ib_dereg_mr.
And, move mlx5_ib_destroy_mr specific logic into mlx5_ib_dereg_mr
(includes only signature stuff for now).
And, fixup the only callers (iser/isert) accordingly.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Currently, ib_create_cq uses cqe and comp_vecotr instead
of the extendible ib_cq_init_attr struct.
Earlier patches already changed the vendors to work with
ib_cq_init_attr. This patch changes the consumers too.
Signed-off-by: Matan Barak <matanb@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Make iser_[create|destroy]_fastreg_desc shorter, more
readable and easily extendable.
This patch does not change any functionality.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Adir Lev <adirl@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
This struct members other than struct iser_mem_reg are unused,
so remove it altogether.
This patch does not change any functionality.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Adir Lev <adirl@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
As memory registration/de-registration methods, lets
move them to their natural location. While we're at it,
make iser_reg_page_vec routine static.
This patch does not change any functionality.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
Fast registration and local invalidate work requests can
also fail. We should call error completion handler for them.
Reported-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
In case the user unloaded ib_iser while ep_connect is in
progress, we need to destroy the endpoint although ep_disconnect
wasn't invoked (we detect this by the iser conn state != DOWN).
However, if we got an REJECTED/UNREACHABLE CM event we move the
connection state to DOWN which will prevent us from destroying
the endpoint in the module unload stage. Fix this by setting the
connection state to TERMINATING in iser_conn_error so we can still
destroy the endpoint at unload stage.
Reported-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Doug Ledford <dledford@redhat.com>
In some cases, we might reach the iser connection termination without
ep_disconnect being invoked (for example if user-space daemon doesn't
exists. In this case, we need to free the iscsi endpoint when we
remove the iser connection.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
When teardown process starts during live IO, we need to keep the
memory regions pool (frmr/fmr) until all in-flight tasks are properly
released, since each task may return a memory region to the pool. In
order to do this, we pass a destroy flag to iser_free_ib_conn_res to
indicate we can destroy the device and the memory regions
pool. iser_conn_release will pass it as true and also DEVICE_REMOVAL
event (we need to let the device to properly remove).
Also, Since we conditionally call iser_free_rx_descriptors,
remove the extra check on iser_conn->rx_descs.
Fixes: 5426b1711f ("IB/iser: Collapse cleanup and disconnect handlers")
Reported-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Use likely() for wc.status == IB_WC_SUCCESS
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
No reason to settle with four, can use the min between device max comp
vectors and number of cores.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
It is enough to check mem_h pointer assignment, mem_h == NULL will
indicate that buffer is not registered using mr.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Use uintptr_t to handle wr_id casting, which was found by Kbuild test
robot and smatch. Also remove an internal definition of variable which
potentially shadows an external one (and make sparse happy).
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
When creating a connection QP we choose the least used CQ and inc the
number of active QPs on that. If we fail to create the QP, we need to
decrement the active QPs counter.
Reported-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
No real need to wait for TIMEWAIT_EXIT before we destroy the RDMA
resources (also TIMEAWAIT_EXIT is not guarenteed to always arrive). As
for the cma_id, only destroy it if the state is not DOWN where in this
case, conn_release is already running and we don't want to compete.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
In case of the HCA going into catasrophic error flow, the
beacon post_send is likely to fail, so surely there will
be no completion for it.
In this case, use a best effort approach and don't wait for beacon
completion if we failed to post the send.
Reported-by: Alex Tabachnik <alext@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Re-adjust max CQEs per CQ and max send_wr per QP according
to the resource limits supported by underlying hardware.
Signed-off-by: Minh Tran <minhduc.tran@emulex.com>
Signed-off-by: Jayamohan Kallickal <jayamohan.kallickal@emulex.com>
Acked-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Singal completion of every 32 scsi commands and suppress all the rest.
We don't do anything upon getting the completion so no need to "just
consume" it. Cleanup of scsi command is done in cleanup_task callback.
Still keep dataout and control send completions as we may need to
cleanup there. This helps reducing the amount of interrupts/completions
in the IO path.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Poll in batch of 16. Since we don't want it on the stack, keep under
iser completion context (iser_comp).
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Avoid post_send counting (atomic) in the IO path just to keep track of
how many completions we need to consume. Use a beacon post to indicate
that all prior posts completed.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
This will solve a possible condition where we might miss TX completion
(flush error) during session teardown. Since we are using a single
CQ, we don't need to actively drain the TX CQ, instead just wait for
flush_completion (when counters reach zero) and remove iser_poll_for_flush_errors().
This patch might introduce a minor performance regression on its own,
but the next patches will enhance performance using a single CQ for RX
and TX.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
We need a way to guarentee that we don't stay in soft-IRQ context for
too long. We might starve other pending CQ tasklets or worse lock
against application trying to issue IO on the running CPU.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Introduce iser_comp which centralizes all iser completion related
items and is referenced by iser_device and each ib_conn.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
In case iscsid was violently killed (SIGKILL) during its error
recovery stage, we may never get a connection teardown sequence for
some of the old connections. No harm done, but when we try to unload
the module we will need to cleanup all these connections. So we
actually may end-up here - so it's not a BUG_ON(), just give a relaxed
warning that this happened and continue with normal unload. BUG_ON()
will cause segfault on module_exit and we don't want that.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Previously we notified iscsi layer about the connection layer when
we consumed all of our flush errors. This was racy as there
was no guarentee that iscsi_conn wasn't terminated by then (which ends
up in an invalid memory access). In case we got a non FLUSH error
completion, we are guarenteed that iscsi_conn is still alive. We should
notify iSCSI layer with iscsi_conn_failure to initiate error handling.
While we are at it, add a nice kernel-doc style documentation.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
We no longer rely on iscsi connection teardown sequence, so no need to
give a grace period and continue cleanup if it expired. Have
iser_conn_release wait for full completion before freeing iser_conn.
ib_completion:
Guaranteed to come when:
- Got DISCONNECTED/ADDR_CHANGE event or
- iSCSI called ep_disconnect/conn_stop
Guaranteed to finish when:
- Got TIMEWAIT_EXIT/DEVICE_REMOVAL event
- All Flush errors are consumed
- IB related resources are destroyed
stop_completion:
Guaranteed to come when:
- iSCSI calls conn_stop
Guaranteed to finish when:
- All inflight tasks were cleaned up
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
iscsi daemon is in user-space, thus we can't rely on it to be invoked
at connection teardown (if not running or does not receive CPU time).
This patch addresses the issue by re-structuring iSER connection
teardown logic and CM events handling.
The CM events will dictate the RDMA resources destruction (ib_conn)
and iser_conn is kept around as long as iscsi_conn is left around
allowing iscsi/iser callbacks to continue after RDMA transport was
destroyed.
This patch introduces a separation in logic when handling CM events:
- DISCONNECTED_HANDLER, ADDR_CHANGED
This events indicate the start of teardown process.
Actions:
1. Terminate the connection: rdma_disconnect (send DREQ/DREP)
2. Notify iSCSI of connection failure
3. Change state to TERMINATING
4. Poll for all flush errors to be consumed
- TIMEWAIT_EXIT, DEVICE_REMOVAL
These events indicate the final stage of termination process and
we can free RDMA related resources.
Actions:
1. Call disconnected handler (we are not guaranteed that DISCONNECTED
event was invoked in the past)
2. Cleanup RDMA related resources
3. For DEVICE_REMOVAL return non-zero rc from cma_handler to
implicitly destroy the cm_id (Can't rely on user-space, make sure
we have forward progress)
We replace flush_completion (indicate all flushes were consumed) with
ib_completion (rdma resources were cleaned up).
The iser_conn_release_work will wait for teardown completions:
- conn_stop was completed (tasks were cleaned-up) - stop_completion
- RDMA resources were destroyed - ib_completion
And then will continue to free iser connection representation (iser_conn).
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Put all connection IB related resources release in this routine. One
exception is the cm_id which cannot be destroyed as the routine is
protected by the state mutex. Also move its position to avoid forward
declaration. While at it fix qp NULL assignment.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Structure that describes the RDMA relates connection objects. Static
member of iser_conn.
This patch does not change any functionality
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Two reasons why we choose to do this:
1. No point today calling struct iser_conn by another name ib_conn
2. In the next patches we will restructure iser control plane representation
- struct iser_conn: connection logical representation
- struct ib_conn: connection RDMA layout representation
This patch does not change any functionality.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
When failing to allocate TX CQ we already allocated RX CQ, so we need to make
sure we release it. Also, when failing to register notification to the RX CQ
we currently leak both RX and TX CQs of the current index, fix that too.
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
This is to prevent someone from thinking that this code section is
redundant.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Instead of waiting for events and condition changes of the iser
connection state, we wait for explicit completion of connection
establishment and teardown.
Separate connection establishment wait object from the teardown object
to avoid a situation where racing connection establishment and
teardown may concurrently wakeup each other.
ep_poll will wait for up_completion invoked by
iser_connected_handler() and iser release worker will wait for
flush_completion before releasing the connection.
Bound the completion wait with a 30 seconds timeout for cases where
iscsid (the user space iscsi daemon) is too slow or gone.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
The iser connection state lookups and transitions are not fully protected.
Some transitions are protected with a spinlock, and in some cases the
state is accessed unprotected due to specific assumptions of the flow.
Introduce a new mutex to protect the connection state access. We use a
mutex since we need to also include a scheduling operations executed
under the state lock.
Each state transition/condition and its corresponding action will be
protected with the state mutex.
The rdma_cm events handler acquires the mutex when handling connection
events. Since iser connection state can transition to DOWN
concurrently during connection establishment, we bailout from
addr/route resolution events when the state is not PENDING.
This addresses a scenario where ep_poll retries expire during CMA
connection establishment. In this case ep_disconnect is invoked while
CMA events keep coming (address/route resolution, connected, etc...).
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Make it void.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
iser connection needs asynchronous cleanup completions which are
triggered in ep_disconnect. As a result we are keeping the
corresponding iscsi_endpoint structure hanging for no good reason. In
order to avoid that, we seperate iser_conn from iscsi_endpoint storage
space to have their destruction being independent.
iscsi_endpoint will be destroyed at ep_disconnect stage, while the
iser connection will wait for asynchronous completions to be released
in an orderly fashion.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
The iser initiator is the RDMA responder so it should publish to the
target the max inflight rdma read requests its local HCA can handle in
responder_resources (max_qp_rd_atom).
The iser target should take the min of that and its local HCA max
inflight oustanding rdma read requests (max_qp_init_rd_atom).
We keep initiator_depth set to 1 in order to compat with old targets.
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
In case the DISCONNECTED event is not delivered after rdma_disconnect
is called, the CM waits TIMEWAIT seconds and delivers the
TIMEWAIT_EXIT local event. We use this as the notification needed to
continue in the teardown and release sequence.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Roi Dayan <roid@mellanox.com>
Reviewed-by: Sagi Grimberg <sagig@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Replace struct sockaddr_in with struct sockaddr which supports both
IPv4 and IPv6, and print using the %pIS format directive.
Signed-off-by: Roi Dayan <roid@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
In some circumstances (multiple targets), RDMA_CM ESTABLISHED event
and ep_disconnect may race. In this case, the iser connection state
may transition to UP (after ep_disconnect transitioned it to
TERMINATING), while the connection is being torn down.
Upon RDMA_CM event ESTABLISHED we allow iser connection state to
transition to UP only from PENDING. We also make sure to protect this
state change (done under the connection lock).
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Reviewed-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
iSER relies on refcounting to manage iser connections establishment
and teardown.
Following commit 39ff05dbbb ("IB/iser: Enhance disconnection logic
for multi-pathing"), iser connection maintain 3 references:
- iscsi_endpoint (at creation stage)
- cma_id (at connection request stage)
- iscsi_conn (at bind stage)
We can avoid taking explicit refcounts by correctly serializing iser
teardown flows (graceful and non-graceful).
Our approach is to trigger a scheduled work to handle ordered teardown
by gracefully waiting for 2 cleanup stages to complete:
1. Cleanup of live pending tasks indicated by iscsi_conn_stop completion
2. Flush errors processing
Each completed stage will notify a waiting worker thread when it is
done to allow teardwon continuation.
Since iSCSI connection establishment may trigger endpoint disconnect
without a successful endpoint connect, we rely on the iscsi <-> iser
binding (.conn_bind) to learn about the teardown policy we should take
wrt cleanup stages.
Since all cleanup worker threads are scheduled (release_wq) in
.ep_disconnect it is safe to assume that when module_exit is called,
all cleanup workers are already scheduled. Thus proper module unload
shall flush all scheduled works before allowing safe exit, to
guarantee no resources got left behind.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Sagi Grimberg <sagig@mellanox.com>
Reviewed-by: Roi Dayan <roid@mellanox.com>
Reviewed-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Update Mellanox copyrights for 2014 on the iser initiator driver.
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
Add an iser info print with the local/remote QP information carried
out when the connection is established. While here, fix a little
leftover from the T10 work and set a debug print to be carried in
debug and not info level.
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>
The iscsi stack has existing mechanisms to link back and forth between
the iscsi connection and the iscsi transport (e.g iser/tcp) connection.
This is done through a dd_data pointer field in struct iscsi_conn
which can be set to point to the transport connection, etc.
The iscsi_iser_conn structure was used to get this linking done in
another way, which is uneeded and adds extra complication to the iser
code, so we just remove it.
Signed-off-by: Ariel Nahum <arieln@mellanox.com>
Signed-off-by: Or Gerlitz <ogerlitz@mellanox.com>
Signed-off-by: Roland Dreier <roland@purestorage.com>