mirror of
https://github.com/torvalds/linux.git
synced 2024-11-26 22:21:42 +00:00
3af7524b14
Running N CPU-bound tasks on an N CPUs platform: - with asymmetric CPU capacity - not being a DynamIq system (i.e. having a PKG level sched domain without the SD_SHARE_PKG_RESOURCES flag set) .. might result in a task placement where two tasks run on a big CPU and none on a little CPU. This placement could be more optimal by using all CPUs. Testing platform: Juno-r2: - 2 big CPUs (1-2), maximum capacity of 1024 - 4 little CPUs (0,3-5), maximum capacity of 383 Testing workload ([1]): Spawn 6 CPU-bound tasks. During the first 100ms (step 1), each tasks is affine to a CPU, except for: - one little CPU which is left idle. - one big CPU which has 2 tasks affine. After the 100ms (step 2), remove the cpumask affinity. Behavior before the patch: During step 2, the load balancer running from the idle CPU tags sched domains as: - little CPUs: 'group_has_spare'. Cf. group_has_capacity() and group_is_overloaded(), 3 CPU-bound tasks run on a 4 CPUs sched-domain, and the idle CPU provides enough spare capacity regarding the imbalance_pct - big CPUs: 'group_overloaded'. Indeed, 3 tasks run on a 2 CPUs sched-domain, so the following path is used: group_is_overloaded() \-if (sgs->sum_nr_running <= sgs->group_weight) return true; The following path which would change the migration type to 'migrate_task' is not taken: calculate_imbalance() \-if (env->idle != CPU_NOT_IDLE && env->imbalance == 0) as the local group has some spare capacity, so the imbalance is not 0. The migration type requested is 'migrate_util' and the busiest runqueue is the big CPU's runqueue having 2 tasks (each having a utilization of 512). The idle little CPU cannot pull one of these task as its capacity is too small for the task. The following path is used: detach_tasks() \-case migrate_util: \-if (util > env->imbalance) goto next; After the patch: As the number of failed balancing attempts grows (with 'nr_balance_failed'), progressively make it easier to migrate a big task to the idling little CPU. A similar mechanism is used for the 'migrate_load' migration type. Improvement: Running the testing workload [1] with the step 2 representing a ~10s load for a big CPU: Before patch: ~19.3s After patch: ~18s (-6.7%) Similar issue reported at: https://lore.kernel.org/lkml/20230716014125.139577-1-qyousef@layalina.io/ Suggested-by: Vincent Guittot <vincent.guittot@linaro.org> Signed-off-by: Pierre Gondois <pierre.gondois@arm.com> Signed-off-by: Ingo Molnar <mingo@kernel.org> Reviewed-by: Vincent Guittot <vincent.guittot@linaro.org> Reviewed-by: Dietmar Eggemann <dietmar.eggemann@arm.com> Acked-by: Qais Yousef <qyousef@layalina.io> Link: https://lore.kernel.org/r/20231206090043.634697-1-pierre.gondois@arm.com |
||
---|---|---|
.. | ||
autogroup.c | ||
autogroup.h | ||
build_policy.c | ||
build_utility.c | ||
clock.c | ||
completion.c | ||
core_sched.c | ||
core.c | ||
cpuacct.c | ||
cpudeadline.c | ||
cpudeadline.h | ||
cpufreq_schedutil.c | ||
cpufreq.c | ||
cpupri.c | ||
cpupri.h | ||
cputime.c | ||
deadline.c | ||
debug.c | ||
fair.c | ||
features.h | ||
idle.c | ||
isolation.c | ||
loadavg.c | ||
Makefile | ||
membarrier.c | ||
pelt.c | ||
pelt.h | ||
psi.c | ||
rt.c | ||
sched-pelt.h | ||
sched.h | ||
smp.h | ||
stats.c | ||
stats.h | ||
stop_task.c | ||
swait.c | ||
topology.c | ||
wait_bit.c | ||
wait.c |