mirror of
https://github.com/torvalds/linux.git
synced 2024-12-25 04:11:49 +00:00
13924d2a98
Add an appendix providing a simple self-contained code snippet showing how SCHED_DEADLINE reservations can be created by application developers. Signed-off-by: Juri Lelli <juri.lelli@arm.com> Reviewed-by: Henrik Austad <henrik@austad.us> Cc: Randy Dunlap <rdunlap@infradead.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Dario Faggioli <raistlin@linux.it> Cc: Juri Lelli <juri.lelli@gmail.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Link: http://lkml.kernel.org/r/1410256636-26171-6-git-send-email-juri.lelli@arm.com [ Fixed some whitespace inconsistencies. ] Signed-off-by: Ingo Molnar <mingo@kernel.org>
526 lines
20 KiB
Plaintext
526 lines
20 KiB
Plaintext
Deadline Task Scheduling
|
||
------------------------
|
||
|
||
CONTENTS
|
||
========
|
||
|
||
0. WARNING
|
||
1. Overview
|
||
2. Scheduling algorithm
|
||
3. Scheduling Real-Time Tasks
|
||
4. Bandwidth management
|
||
4.1 System-wide settings
|
||
4.2 Task interface
|
||
4.3 Default behavior
|
||
5. Tasks CPU affinity
|
||
5.1 SCHED_DEADLINE and cpusets HOWTO
|
||
6. Future plans
|
||
A. Test suite
|
||
B. Minimal main()
|
||
|
||
|
||
0. WARNING
|
||
==========
|
||
|
||
Fiddling with these settings can result in an unpredictable or even unstable
|
||
system behavior. As for -rt (group) scheduling, it is assumed that root users
|
||
know what they're doing.
|
||
|
||
|
||
1. Overview
|
||
===========
|
||
|
||
The SCHED_DEADLINE policy contained inside the sched_dl scheduling class is
|
||
basically an implementation of the Earliest Deadline First (EDF) scheduling
|
||
algorithm, augmented with a mechanism (called Constant Bandwidth Server, CBS)
|
||
that makes it possible to isolate the behavior of tasks between each other.
|
||
|
||
|
||
2. Scheduling algorithm
|
||
==================
|
||
|
||
SCHED_DEADLINE uses three parameters, named "runtime", "period", and
|
||
"deadline", to schedule tasks. A SCHED_DEADLINE task should receive
|
||
"runtime" microseconds of execution time every "period" microseconds, and
|
||
these "runtime" microseconds are available within "deadline" microseconds
|
||
from the beginning of the period. In order to implement this behaviour,
|
||
every time the task wakes up, the scheduler computes a "scheduling deadline"
|
||
consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
|
||
scheduled using EDF[1] on these scheduling deadlines (the task with the
|
||
earliest scheduling deadline is selected for execution). Notice that the
|
||
task actually receives "runtime" time units within "deadline" if a proper
|
||
"admission control" strategy (see Section "4. Bandwidth management") is used
|
||
(clearly, if the system is overloaded this guarantee cannot be respected).
|
||
|
||
Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so
|
||
that each task runs for at most its runtime every period, avoiding any
|
||
interference between different tasks (bandwidth isolation), while the EDF[1]
|
||
algorithm selects the task with the earliest scheduling deadline as the one
|
||
to be executed next. Thanks to this feature, tasks that do not strictly comply
|
||
with the "traditional" real-time task model (see Section 3) can effectively
|
||
use the new policy.
|
||
|
||
In more details, the CBS algorithm assigns scheduling deadlines to
|
||
tasks in the following way:
|
||
|
||
- Each SCHED_DEADLINE task is characterised by the "runtime",
|
||
"deadline", and "period" parameters;
|
||
|
||
- The state of the task is described by a "scheduling deadline", and
|
||
a "remaining runtime". These two parameters are initially set to 0;
|
||
|
||
- When a SCHED_DEADLINE task wakes up (becomes ready for execution),
|
||
the scheduler checks if
|
||
|
||
remaining runtime runtime
|
||
---------------------------------- > ---------
|
||
scheduling deadline - current time period
|
||
|
||
then, if the scheduling deadline is smaller than the current time, or
|
||
this condition is verified, the scheduling deadline and the
|
||
remaining runtime are re-initialised as
|
||
|
||
scheduling deadline = current time + deadline
|
||
remaining runtime = runtime
|
||
|
||
otherwise, the scheduling deadline and the remaining runtime are
|
||
left unchanged;
|
||
|
||
- When a SCHED_DEADLINE task executes for an amount of time t, its
|
||
remaining runtime is decreased as
|
||
|
||
remaining runtime = remaining runtime - t
|
||
|
||
(technically, the runtime is decreased at every tick, or when the
|
||
task is descheduled / preempted);
|
||
|
||
- When the remaining runtime becomes less or equal than 0, the task is
|
||
said to be "throttled" (also known as "depleted" in real-time literature)
|
||
and cannot be scheduled until its scheduling deadline. The "replenishment
|
||
time" for this task (see next item) is set to be equal to the current
|
||
value of the scheduling deadline;
|
||
|
||
- When the current time is equal to the replenishment time of a
|
||
throttled task, the scheduling deadline and the remaining runtime are
|
||
updated as
|
||
|
||
scheduling deadline = scheduling deadline + period
|
||
remaining runtime = remaining runtime + runtime
|
||
|
||
|
||
3. Scheduling Real-Time Tasks
|
||
=============================
|
||
|
||
* BIG FAT WARNING ******************************************************
|
||
*
|
||
* This section contains a (not-thorough) summary on classical deadline
|
||
* scheduling theory, and how it applies to SCHED_DEADLINE.
|
||
* The reader can "safely" skip to Section 4 if only interested in seeing
|
||
* how the scheduling policy can be used. Anyway, we strongly recommend
|
||
* to come back here and continue reading (once the urge for testing is
|
||
* satisfied :P) to be sure of fully understanding all technical details.
|
||
************************************************************************
|
||
|
||
There are no limitations on what kind of task can exploit this new
|
||
scheduling discipline, even if it must be said that it is particularly
|
||
suited for periodic or sporadic real-time tasks that need guarantees on their
|
||
timing behavior, e.g., multimedia, streaming, control applications, etc.
|
||
|
||
A typical real-time task is composed of a repetition of computation phases
|
||
(task instances, or jobs) which are activated on a periodic or sporadic
|
||
fashion.
|
||
Each job J_j (where J_j is the j^th job of the task) is characterised by an
|
||
arrival time r_j (the time when the job starts), an amount of computation
|
||
time c_j needed to finish the job, and a job absolute deadline d_j, which
|
||
is the time within which the job should be finished. The maximum execution
|
||
time max_j{c_j} is called "Worst Case Execution Time" (WCET) for the task.
|
||
A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
|
||
sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
|
||
d_j = r_j + D, where D is the task's relative deadline.
|
||
The utilisation of a real-time task is defined as the ratio between its
|
||
WCET and its period (or minimum inter-arrival time), and represents
|
||
the fraction of CPU time needed to execute the task.
|
||
|
||
If the total utilisation sum_i(WCET_i/P_i) is larger than M (with M equal
|
||
to the number of CPUs), then the scheduler is unable to respect all the
|
||
deadlines.
|
||
Note that total utilisation is defined as the sum of the utilisations
|
||
WCET_i/P_i over all the real-time tasks in the system. When considering
|
||
multiple real-time tasks, the parameters of the i-th task are indicated
|
||
with the "_i" suffix.
|
||
Moreover, if the total utilisation is larger than M, then we risk starving
|
||
non- real-time tasks by real-time tasks.
|
||
If, instead, the total utilisation is smaller than M, then non real-time
|
||
tasks will not be starved and the system might be able to respect all the
|
||
deadlines.
|
||
As a matter of fact, in this case it is possible to provide an upper bound
|
||
for tardiness (defined as the maximum between 0 and the difference
|
||
between the finishing time of a job and its absolute deadline).
|
||
More precisely, it can be proven that using a global EDF scheduler the
|
||
maximum tardiness of each task is smaller or equal than
|
||
((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max
|
||
where WCET_max = max_i{WCET_i} is the maximum WCET, WCET_min=min_i{WCET_i}
|
||
is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilisation.
|
||
|
||
If M=1 (uniprocessor system), or in case of partitioned scheduling (each
|
||
real-time task is statically assigned to one and only one CPU), it is
|
||
possible to formally check if all the deadlines are respected.
|
||
If D_i = P_i for all tasks, then EDF is able to respect all the deadlines
|
||
of all the tasks executing on a CPU if and only if the total utilisation
|
||
of the tasks running on such a CPU is smaller or equal than 1.
|
||
If D_i != P_i for some task, then it is possible to define the density of
|
||
a task as C_i/min{D_i,T_i}, and EDF is able to respect all the deadlines
|
||
of all the tasks running on a CPU if the sum sum_i C_i/min{D_i,T_i} of the
|
||
densities of the tasks running on such a CPU is smaller or equal than 1
|
||
(notice that this condition is only sufficient, and not necessary).
|
||
|
||
On multiprocessor systems with global EDF scheduling (non partitioned
|
||
systems), a sufficient test for schedulability can not be based on the
|
||
utilisations (it can be shown that task sets with utilisations slightly
|
||
larger than 1 can miss deadlines regardless of the number of CPUs M).
|
||
However, as previously stated, enforcing that the total utilisation is smaller
|
||
than M is enough to guarantee that non real-time tasks are not starved and
|
||
that the tardiness of real-time tasks has an upper bound.
|
||
|
||
SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that
|
||
the jobs' deadlines of a task are respected. In order to do this, a task
|
||
must be scheduled by setting:
|
||
|
||
- runtime >= WCET
|
||
- deadline = D
|
||
- period <= P
|
||
|
||
IOW, if runtime >= WCET and if period is >= P, then the scheduling deadlines
|
||
and the absolute deadlines (d_j) coincide, so a proper admission control
|
||
allows to respect the jobs' absolute deadlines for this task (this is what is
|
||
called "hard schedulability property" and is an extension of Lemma 1 of [2]).
|
||
Notice that if runtime > deadline the admission control will surely reject
|
||
this task, as it is not possible to respect its temporal constraints.
|
||
|
||
References:
|
||
1 - C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogram-
|
||
ming in a hard-real-time environment. Journal of the Association for
|
||
Computing Machinery, 20(1), 1973.
|
||
2 - L. Abeni , G. Buttazzo. Integrating Multimedia Applications in Hard
|
||
Real-Time Systems. Proceedings of the 19th IEEE Real-time Systems
|
||
Symposium, 1998. http://retis.sssup.it/~giorgio/paps/1998/rtss98-cbs.pdf
|
||
3 - L. Abeni. Server Mechanisms for Multimedia Applications. ReTiS Lab
|
||
Technical Report. http://disi.unitn.it/~abeni/tr-98-01.pdf
|
||
|
||
4. Bandwidth management
|
||
=======================
|
||
|
||
As previously mentioned, in order for -deadline scheduling to be
|
||
effective and useful (that is, to be able to provide "runtime" time units
|
||
within "deadline"), it is important to have some method to keep the allocation
|
||
of the available fractions of CPU time to the various tasks under control.
|
||
This is usually called "admission control" and if it is not performed, then
|
||
no guarantee can be given on the actual scheduling of the -deadline tasks.
|
||
|
||
As already stated in Section 3, a necessary condition to be respected to
|
||
correctly schedule a set of real-time tasks is that the total utilisation
|
||
is smaller than M. When talking about -deadline tasks, this requires that
|
||
the sum of the ratio between runtime and period for all tasks is smaller
|
||
than M. Notice that the ratio runtime/period is equivalent to the utilisation
|
||
of a "traditional" real-time task, and is also often referred to as
|
||
"bandwidth".
|
||
The interface used to control the CPU bandwidth that can be allocated
|
||
to -deadline tasks is similar to the one already used for -rt
|
||
tasks with real-time group scheduling (a.k.a. RT-throttling - see
|
||
Documentation/scheduler/sched-rt-group.txt), and is based on readable/
|
||
writable control files located in procfs (for system wide settings).
|
||
Notice that per-group settings (controlled through cgroupfs) are still not
|
||
defined for -deadline tasks, because more discussion is needed in order to
|
||
figure out how we want to manage SCHED_DEADLINE bandwidth at the task group
|
||
level.
|
||
|
||
A main difference between deadline bandwidth management and RT-throttling
|
||
is that -deadline tasks have bandwidth on their own (while -rt ones don't!),
|
||
and thus we don't need a higher level throttling mechanism to enforce the
|
||
desired bandwidth. In other words, this means that interface parameters are
|
||
only used at admission control time (i.e., when the user calls
|
||
sched_setattr()). Scheduling is then performed considering actual tasks'
|
||
parameters, so that CPU bandwidth is allocated to SCHED_DEADLINE tasks
|
||
respecting their needs in terms of granularity. Therefore, using this simple
|
||
interface we can put a cap on total utilization of -deadline tasks (i.e.,
|
||
\Sum (runtime_i / period_i) < global_dl_utilization_cap).
|
||
|
||
4.1 System wide settings
|
||
------------------------
|
||
|
||
The system wide settings are configured under the /proc virtual file system.
|
||
|
||
For now the -rt knobs are used for -deadline admission control and the
|
||
-deadline runtime is accounted against the -rt runtime. We realise that this
|
||
isn't entirely desirable; however, it is better to have a small interface for
|
||
now, and be able to change it easily later. The ideal situation (see 5.) is to
|
||
run -rt tasks from a -deadline server; in which case the -rt bandwidth is a
|
||
direct subset of dl_bw.
|
||
|
||
This means that, for a root_domain comprising M CPUs, -deadline tasks
|
||
can be created while the sum of their bandwidths stays below:
|
||
|
||
M * (sched_rt_runtime_us / sched_rt_period_us)
|
||
|
||
It is also possible to disable this bandwidth management logic, and
|
||
be thus free of oversubscribing the system up to any arbitrary level.
|
||
This is done by writing -1 in /proc/sys/kernel/sched_rt_runtime_us.
|
||
|
||
|
||
4.2 Task interface
|
||
------------------
|
||
|
||
Specifying a periodic/sporadic task that executes for a given amount of
|
||
runtime at each instance, and that is scheduled according to the urgency of
|
||
its own timing constraints needs, in general, a way of declaring:
|
||
- a (maximum/typical) instance execution time,
|
||
- a minimum interval between consecutive instances,
|
||
- a time constraint by which each instance must be completed.
|
||
|
||
Therefore:
|
||
* a new struct sched_attr, containing all the necessary fields is
|
||
provided;
|
||
* the new scheduling related syscalls that manipulate it, i.e.,
|
||
sched_setattr() and sched_getattr() are implemented.
|
||
|
||
|
||
4.3 Default behavior
|
||
---------------------
|
||
|
||
The default value for SCHED_DEADLINE bandwidth is to have rt_runtime equal to
|
||
950000. With rt_period equal to 1000000, by default, it means that -deadline
|
||
tasks can use at most 95%, multiplied by the number of CPUs that compose the
|
||
root_domain, for each root_domain.
|
||
This means that non -deadline tasks will receive at least 5% of the CPU time,
|
||
and that -deadline tasks will receive their runtime with a guaranteed
|
||
worst-case delay respect to the "deadline" parameter. If "deadline" = "period"
|
||
and the cpuset mechanism is used to implement partitioned scheduling (see
|
||
Section 5), then this simple setting of the bandwidth management is able to
|
||
deterministically guarantee that -deadline tasks will receive their runtime
|
||
in a period.
|
||
|
||
Finally, notice that in order not to jeopardize the admission control a
|
||
-deadline task cannot fork.
|
||
|
||
5. Tasks CPU affinity
|
||
=====================
|
||
|
||
-deadline tasks cannot have an affinity mask smaller that the entire
|
||
root_domain they are created on. However, affinities can be specified
|
||
through the cpuset facility (Documentation/cgroups/cpusets.txt).
|
||
|
||
5.1 SCHED_DEADLINE and cpusets HOWTO
|
||
------------------------------------
|
||
|
||
An example of a simple configuration (pin a -deadline task to CPU0)
|
||
follows (rt-app is used to create a -deadline task).
|
||
|
||
mkdir /dev/cpuset
|
||
mount -t cgroup -o cpuset cpuset /dev/cpuset
|
||
cd /dev/cpuset
|
||
mkdir cpu0
|
||
echo 0 > cpu0/cpuset.cpus
|
||
echo 0 > cpu0/cpuset.mems
|
||
echo 1 > cpuset.cpu_exclusive
|
||
echo 0 > cpuset.sched_load_balance
|
||
echo 1 > cpu0/cpuset.cpu_exclusive
|
||
echo 1 > cpu0/cpuset.mem_exclusive
|
||
echo $$ > cpu0/tasks
|
||
rt-app -t 100000:10000:d:0 -D5 (it is now actually superfluous to specify
|
||
task affinity)
|
||
|
||
6. Future plans
|
||
===============
|
||
|
||
Still missing:
|
||
|
||
- refinements to deadline inheritance, especially regarding the possibility
|
||
of retaining bandwidth isolation among non-interacting tasks. This is
|
||
being studied from both theoretical and practical points of view, and
|
||
hopefully we should be able to produce some demonstrative code soon;
|
||
- (c)group based bandwidth management, and maybe scheduling;
|
||
- access control for non-root users (and related security concerns to
|
||
address), which is the best way to allow unprivileged use of the mechanisms
|
||
and how to prevent non-root users "cheat" the system?
|
||
|
||
As already discussed, we are planning also to merge this work with the EDF
|
||
throttling patches [https://lkml.org/lkml/2010/2/23/239] but we still are in
|
||
the preliminary phases of the merge and we really seek feedback that would
|
||
help us decide on the direction it should take.
|
||
|
||
Appendix A. Test suite
|
||
======================
|
||
|
||
The SCHED_DEADLINE policy can be easily tested using two applications that
|
||
are part of a wider Linux Scheduler validation suite. The suite is
|
||
available as a GitHub repository: https://github.com/scheduler-tools.
|
||
|
||
The first testing application is called rt-app and can be used to
|
||
start multiple threads with specific parameters. rt-app supports
|
||
SCHED_{OTHER,FIFO,RR,DEADLINE} scheduling policies and their related
|
||
parameters (e.g., niceness, priority, runtime/deadline/period). rt-app
|
||
is a valuable tool, as it can be used to synthetically recreate certain
|
||
workloads (maybe mimicking real use-cases) and evaluate how the scheduler
|
||
behaves under such workloads. In this way, results are easily reproducible.
|
||
rt-app is available at: https://github.com/scheduler-tools/rt-app.
|
||
|
||
Thread parameters can be specified from the command line, with something like
|
||
this:
|
||
|
||
# rt-app -t 100000:10000:d -t 150000:20000:f:10 -D5
|
||
|
||
The above creates 2 threads. The first one, scheduled by SCHED_DEADLINE,
|
||
executes for 10ms every 100ms. The second one, scheduled at SCHED_FIFO
|
||
priority 10, executes for 20ms every 150ms. The test will run for a total
|
||
of 5 seconds.
|
||
|
||
More interestingly, configurations can be described with a json file that
|
||
can be passed as input to rt-app with something like this:
|
||
|
||
# rt-app my_config.json
|
||
|
||
The parameters that can be specified with the second method are a superset
|
||
of the command line options. Please refer to rt-app documentation for more
|
||
details (<rt-app-sources>/doc/*.json).
|
||
|
||
The second testing application is a modification of schedtool, called
|
||
schedtool-dl, which can be used to setup SCHED_DEADLINE parameters for a
|
||
certain pid/application. schedtool-dl is available at:
|
||
https://github.com/scheduler-tools/schedtool-dl.git.
|
||
|
||
The usage is straightforward:
|
||
|
||
# schedtool -E -t 10000000:100000000 -e ./my_cpuhog_app
|
||
|
||
With this, my_cpuhog_app is put to run inside a SCHED_DEADLINE reservation
|
||
of 10ms every 100ms (note that parameters are expressed in microseconds).
|
||
You can also use schedtool to create a reservation for an already running
|
||
application, given that you know its pid:
|
||
|
||
# schedtool -E -t 10000000:100000000 my_app_pid
|
||
|
||
Appendix B. Minimal main()
|
||
==========================
|
||
|
||
We provide in what follows a simple (ugly) self-contained code snippet
|
||
showing how SCHED_DEADLINE reservations can be created by a real-time
|
||
application developer.
|
||
|
||
#define _GNU_SOURCE
|
||
#include <unistd.h>
|
||
#include <stdio.h>
|
||
#include <stdlib.h>
|
||
#include <string.h>
|
||
#include <time.h>
|
||
#include <linux/unistd.h>
|
||
#include <linux/kernel.h>
|
||
#include <linux/types.h>
|
||
#include <sys/syscall.h>
|
||
#include <pthread.h>
|
||
|
||
#define gettid() syscall(__NR_gettid)
|
||
|
||
#define SCHED_DEADLINE 6
|
||
|
||
/* XXX use the proper syscall numbers */
|
||
#ifdef __x86_64__
|
||
#define __NR_sched_setattr 314
|
||
#define __NR_sched_getattr 315
|
||
#endif
|
||
|
||
#ifdef __i386__
|
||
#define __NR_sched_setattr 351
|
||
#define __NR_sched_getattr 352
|
||
#endif
|
||
|
||
#ifdef __arm__
|
||
#define __NR_sched_setattr 380
|
||
#define __NR_sched_getattr 381
|
||
#endif
|
||
|
||
static volatile int done;
|
||
|
||
struct sched_attr {
|
||
__u32 size;
|
||
|
||
__u32 sched_policy;
|
||
__u64 sched_flags;
|
||
|
||
/* SCHED_NORMAL, SCHED_BATCH */
|
||
__s32 sched_nice;
|
||
|
||
/* SCHED_FIFO, SCHED_RR */
|
||
__u32 sched_priority;
|
||
|
||
/* SCHED_DEADLINE (nsec) */
|
||
__u64 sched_runtime;
|
||
__u64 sched_deadline;
|
||
__u64 sched_period;
|
||
};
|
||
|
||
int sched_setattr(pid_t pid,
|
||
const struct sched_attr *attr,
|
||
unsigned int flags)
|
||
{
|
||
return syscall(__NR_sched_setattr, pid, attr, flags);
|
||
}
|
||
|
||
int sched_getattr(pid_t pid,
|
||
struct sched_attr *attr,
|
||
unsigned int size,
|
||
unsigned int flags)
|
||
{
|
||
return syscall(__NR_sched_getattr, pid, attr, size, flags);
|
||
}
|
||
|
||
void *run_deadline(void *data)
|
||
{
|
||
struct sched_attr attr;
|
||
int x = 0;
|
||
int ret;
|
||
unsigned int flags = 0;
|
||
|
||
printf("deadline thread started [%ld]\n", gettid());
|
||
|
||
attr.size = sizeof(attr);
|
||
attr.sched_flags = 0;
|
||
attr.sched_nice = 0;
|
||
attr.sched_priority = 0;
|
||
|
||
/* This creates a 10ms/30ms reservation */
|
||
attr.sched_policy = SCHED_DEADLINE;
|
||
attr.sched_runtime = 10 * 1000 * 1000;
|
||
attr.sched_period = attr.sched_deadline = 30 * 1000 * 1000;
|
||
|
||
ret = sched_setattr(0, &attr, flags);
|
||
if (ret < 0) {
|
||
done = 0;
|
||
perror("sched_setattr");
|
||
exit(-1);
|
||
}
|
||
|
||
while (!done) {
|
||
x++;
|
||
}
|
||
|
||
printf("deadline thread dies [%ld]\n", gettid());
|
||
return NULL;
|
||
}
|
||
|
||
int main (int argc, char **argv)
|
||
{
|
||
pthread_t thread;
|
||
|
||
printf("main thread [%ld]\n", gettid());
|
||
|
||
pthread_create(&thread, NULL, run_deadline, NULL);
|
||
|
||
sleep(10);
|
||
|
||
done = 1;
|
||
pthread_join(thread, NULL);
|
||
|
||
printf("main dies [%ld]\n", gettid());
|
||
return 0;
|
||
}
|